Project profitability for design studios
Track the fee, the hours and the real cost on every phase you run.
Profit on finished work
$32,141
40% of $79,400 in fees, across six phases
Nobody filled in a timesheet.
Utilization
Where this week went
177.5h logged
Profit
Cedar Ridge concept lost $510 — 157 hours against a $4,200 fee
What you see
The fee is in the contract. The hours are in a spreadsheet somebody chases on Friday. What the work cost to deliver is nowhere at all, so the one subtraction that matters never gets made.
Drover puts all three on one row, for every phase, while you can still do something about it.
What you find first
Every phase here was sold by the same people, to the same standard, in the same year. One kept 65 cents of every dollar. One handed back twelve. Nobody in the studio could have told you which was which.
That spread is not a failure of effort. It is what happens when a fixed fee meets a job nobody measured — and it is the first thing the product shows you.
Profit
Halcyon House · Detail drawing
62%
$7,701 kept of a $12,400 fee, over 127 hours
Finished phases · margin on the fee
Six phases
Best
65%
Brookline, initial direction
Worst
−12%
157 hours against a $4,200 fee
Across the book
40%
$32,141 kept of $79,400 in fees
Fee minus what the hours cost, phase by phase. No estimate of completeness, no allocation anyone can argue with.
The studio did not lose money on that phase by accident. It lost it the moment somebody decided who would do the work.
How it works
Hours come from a task's own status changes — the gap between going In progress and leaving again, clipped to working hours. Nobody rounds up on a Friday. Nobody rebuilds a fortnight from memory.
Which bucket an hour lands in is derived too, from what the task is attached to. Nobody picks it from a dropdown, so nobody can talk the number up in a review.
Team Schedule
MER-402 · RFI 41
In progress 09:40, external review 12:40. 3h recorded, and nobody typed a number.
The STATE column at the end of every row is the timesheet. Moving a task into In progress starts the clock and moving it out stops it, which is where 3h of 3h on the RFI came from. The BUCKET column beside it is derived the same way — nobody chose it.
The quiet number
Every studio absorbs work. The reselection after the client saw it in the room, the delivery nobody scheduled into a fee, the supplier chased for the third time. None of it is worth the argument on its own, which is exactly why it never gets counted.
Team Schedule
MER-390 · Reselect the dining pendants
Original discontinued. 5.5 hours on the clock, and no work item behind any of them.
Hours nobody is paying for · week of 14 September
16% of everything logged
Worked, no fee behind it
29h
In a single week, across four kinds of work
What those hours cost
$638
At what the people doing them cost the firm
Nobody logged any of this as free. It is free because no work item covers it, which is also why nobody has ever added it up before.
For whoever runs the week
A principal wants to know whether the job made money. Whoever runs the studio wants to know who is drowning and what is stuck with a client. Both come out of the same records, so there is no second system to keep and no week where the two disagree.
You can see who is carrying the week and who has room, without asking anyone — the estimate on every task was set when the phase was planned and has been spreading across their calendar since.
Utilization
Busiest this week
78%
Marissa, on four jobs. Four people have nothing booked.
The team this week
18 people · busiest at 78%
Open one and you get their tasks, not a conversation about whether the number is fair.
Editions
On purpose. This edition is for studios that already bill through something they are happy with. Work arrives here already sold and already priced. The only question it answers is what it cost to deliver.
A second edition runs the chain the other way round: the contract is written in the product and the tasks come from its lines. Want both? Say so on the form.
Early access
We are setting the first studios up by hand, a few at a time. Rough size and whatever you use today is enough to start.
We will write before the next few places open. The first message asks which of your live projects you want set up first.